TIANJIN RELIANCE STEEL CO., LTD

Jinghai District Tianjin City, China
1

Factory Supply Industrial Steel Pipe - scaffolding Steel plank frame systems – RELIANCE

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

With reliable quality process, good reputation and perfect customer service, the series of products produced by our company are exported to many countries and regions for Scaffolding Steel Pipe , Square Hollow Steel Tube , Carbon Steel Pipe With Black Painting , Our concept would be to assist presenting the confidence of each prospective buyers while using the offering of our most honest service, as well as right merchandise.
Factory Supply Industrial Steel Pipe - scaffolding Steel plank frame systems – RELIANCE Detail:

Product Description

 

图片26
1) Material: Pre-galvanized steel coil
2) Grade: Q195
3) Width: 210mm/240mm/225mm/250mm/230mm
4) Height: 45mm/50mm/65mm/38mm
5) Thickness: 1.0-2.0mm
5) Length: 1-4m
6) Package: by bundle/by piece suitable for sea transportation
7)Dual-use steel plank with hook,can be used as a toe board, this is our team new designed in 2018.
8)Certificate: SGS/ISO 
9)Sample is available
 

Support

Type

Surface

Width

(MM)

Height

(MM)

Length

(MM)

Common/ Square/ Ladder Support

Pre-galvanized

210

45

1000-4000

225

38

1000-4000

230

65

1000-4000

240

45

1000-4000

250

50

1000-4000 

 

图片27 图片28
Plank Application
图片29
Packaging & Shipping
图片30
Package in bundle,bulk or as customers’ require
 
Company Information
图片31
Tianjin Reliance Company , is specialized in manufacturing steel pipes. and many special service can be done for you. such as ends treatment, surface finished, with fittings, loading all kinds of sizes’ goods in container together, and so on.
图片32
Our office is located in Nankai distric, Tianjin city, near Beijing, the capital of China, and with excellent location.It just takes 2 hours from beijing international airport to our company by high speed rail.and the goods can be delivered from our factory to Tianjin port for 2 hours. you can take 40 minutes from our office to Tianjin beihai international airport by subway.
图片33
Export record:
India,Pakistan,Tajikistan,Thailand,Myanmar,Australia,Canada,United States,United Kingdom,Kuwait,Mauritius,Morocco,Paraguay,Ghana,Fiji,Oman,Czech Republic,Kuwait,Korea and so on. galvanized 
 


Product detail pictures:

Factory Supply Industrial Steel Pipe -
 scaffolding Steel plank frame systems – RELIANCE detail pictures

Factory Supply Industrial Steel Pipe -
 scaffolding Steel plank frame systems – RELIANCE detail pictures


Related Product Guide:
Oregon State takes doubleheader from Husker hardball | Sch 40 Steel Pipe
Catalytic reductive [4 + 1]-cycloadditions of vinylidenes and dienes | Welded Carbon Steel Pipe

Our intention should be to fulfill our consumers by offering golden provider, superior price and superior quality for Factory Supply Industrial Steel Pipe - scaffolding Steel plank frame systems – RELIANCE, The product will supply to all over the world, such as: Singapore , Manila , Latvia , Insisting over the high-quality generation line management and prospects guide provider, we have made our resolution to offer our shoppers using the initially stage purchasing and soon after provider working experience. Preserving the prevailing helpful relations with our prospects, we even now innovate our product lists the many time to meet up with the brand new wants and stick to the latest trend of this business in Ahmedabad. We're ready to facial area the difficulties and make the transform to grasp many of the possibilities in international trade.
  • A nice supplier in this industry, after a detail and careful discussion, we reached a consensus agreement. Hope that we cooperate smoothly.
    5 Stars By June from Angola - 2016.09.16 13:44
    This company has the idea of better quality, lower processing costs, prices are more reasonable, so they have competitive product quality and price, that's the main reason we chose to cooperate.
    5 Stars By Beryl from Madagascar - 2016.02.18 15:54