TIANJIN RELIANCE STEEL CO., LTD

Jinghai District Tianjin City, China
1

Factory Supply Industrial Steel Pipe - scaffolding Steel plank frame systems – RELIANCE

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our solutions are widely regarded and trustworthy by consumers and may meet continually modifying financial and social requirements for Steel Pipe Seamless , Seamless Steel Pipe Korea , Rectangular Steel Gi Pipe , For further information, please do not hesitate to contact us. All inquiries from you will be highly appreciated.
Factory Supply Industrial Steel Pipe - scaffolding Steel plank frame systems – RELIANCE Detail:

Product Description

 

图片26
1) Material: Pre-galvanized steel coil
2) Grade: Q195
3) Width: 210mm/240mm/225mm/250mm/230mm
4) Height: 45mm/50mm/65mm/38mm
5) Thickness: 1.0-2.0mm
5) Length: 1-4m
6) Package: by bundle/by piece suitable for sea transportation
7)Dual-use steel plank with hook,can be used as a toe board, this is our team new designed in 2018.
8)Certificate: SGS/ISO 
9)Sample is available
 

Support

Type

Surface

Width

(MM)

Height

(MM)

Length

(MM)

Common/ Square/ Ladder Support

Pre-galvanized

210

45

1000-4000

225

38

1000-4000

230

65

1000-4000

240

45

1000-4000

250

50

1000-4000 

 

图片27 图片28
Plank Application
图片29
Packaging & Shipping
图片30
Package in bundle,bulk or as customers’ require
 
Company Information
图片31
Tianjin Reliance Company , is specialized in manufacturing steel pipes. and many special service can be done for you. such as ends treatment, surface finished, with fittings, loading all kinds of sizes’ goods in container together, and so on.
图片32
Our office is located in Nankai distric, Tianjin city, near Beijing, the capital of China, and with excellent location.It just takes 2 hours from beijing international airport to our company by high speed rail.and the goods can be delivered from our factory to Tianjin port for 2 hours. you can take 40 minutes from our office to Tianjin beihai international airport by subway.
图片33
Export record:
India,Pakistan,Tajikistan,Thailand,Myanmar,Australia,Canada,United States,United Kingdom,Kuwait,Mauritius,Morocco,Paraguay,Ghana,Fiji,Oman,Czech Republic,Kuwait,Korea and so on. galvanized 
 


Product detail pictures:

Factory Supply Industrial Steel Pipe -
 scaffolding Steel plank frame systems – RELIANCE detail pictures

Factory Supply Industrial Steel Pipe -
 scaffolding Steel plank frame systems – RELIANCE detail pictures


Related Product Guide:
An order stops work on the Mountain Valley Pipeline, but for how long? | Business | Welded Carbon Steel Pipe
An order stops work on the Mountain Valley Pipeline, but for how long? | Business | 3/4" Gi Pipe

We have our own sales team, design team, technical team, QC team and package team. We have strict quality control procedures for each process. Also, all of our workers are experienced in printing field for Factory Supply Industrial Steel Pipe - scaffolding Steel plank frame systems – RELIANCE, The product will supply to all over the world, such as: Rwanda , Montpellier , Southampton , Our tenet is integrity first, quality best. We have confidence in providing you with excellent service and ideal products. We sincerely hope we can establish win-win business cooperation with you in the future!
  • The company has rich resources, advanced machinery, experienced workers and excellent services, hope you keep improving and perfecting your products and service, wish you better!
    5 Stars By Gabrielle from Dubai - 2015.09.21 11:01
    Product quality is good, quality assurance system is complete, every link can inquire and solve the problem timely!
    5 Stars By Eileen from Peru - 2016.08.15 12:36