TIANJIN RELIANCE STEEL CO., LTD

Jinghai District Tianjin City, China
1

Short Lead Time for Water Well Drill Pipe - 240mm*45mm*3m/4m steel scaffolding board/plank – RELIANCE

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We know that we only thrive if we will guarantee our combined cost competiveness and high-quality advantageous at the same time for Steel Welding Pipes , Scaffold Tube , Bundy Steel Brake Pipe , The mission of our firm should be to provide the best high quality goods with finest price tag. We've been on the lookout forward to doing organization with you!
Short Lead Time for Water Well Drill Pipe - 240mm*45mm*3m/4m steel scaffolding board/plank – RELIANCE Detail:

Product Description

 

图片26
1) Material: Pre-galvanized steel coil
2) Grade: Q195
3) Width: 210mm/240mm/225mm/250mm/230mm
4) Height: 45mm/50mm/65mm/38mm
5) Thickness: 1.0-2.0mm
5) Length: 1-4m
6) Package: by bundle/by piece suitable for sea transportation
7)Dual-use steel plank with hook,can be used as a toe board, this is our team new designed in 2018.
8)Certificate: SGS/ISO 
9)Sample is available
 

Support

Type

Surface

Width

(MM)

Height

(MM)

Length

(MM)

Common/ Square/ Ladder Support

Pre-galvanized

210

45

1000-4000

225

38

1000-4000

230

65

1000-4000

240

45

1000-4000

250

50

1000-4000 

 

图片27 图片28
Plank Application
图片29
Packaging & Shipping
图片30
Package in bundle,bulk or as customers’ require
 
Company Information
图片31
Tianjin Reliance Company , is specialized in manufacturing steel pipes. and many special service can be done for you. such as ends treatment, surface finished, with fittings, loading all kinds of sizes’ goods in container together, and so on.
图片32
Our office is located in Nankai distric, Tianjin city, near Beijing, the capital of China, and with excellent location.It just takes 2 hours from beijing international airport to our company by high speed rail.and the goods can be delivered from our factory to Tianjin port for 2 hours. you can take 40 minutes from our office to Tianjin beihai international airport by subway.
图片33
Export record:
India,Pakistan,Tajikistan,Thailand,Myanmar,Australia,Canada,United States,United Kingdom,Kuwait,Mauritius,Morocco,Paraguay,Ghana,Fiji,Oman,Czech Republic,Kuwait,Korea and so on. galvanized 
 


Product detail pictures:

Short Lead Time for Water Well Drill Pipe -
 240mm*45mm*3m/4m steel scaffolding board/plank – RELIANCE detail pictures

Short Lead Time for Water Well Drill Pipe -
 240mm*45mm*3m/4m steel scaffolding board/plank – RELIANCE detail pictures


Related Product Guide:
exchangemagazine.com | 8 Inch Steel Pipe
Ternium (TX) Downgraded by Itau BBA Securities | Sch 40 Steel Pipe

We retain bettering and perfecting our merchandise and service. At the same time, we do the job actively to do research and improvement for Short Lead Time for Water Well Drill Pipe - 240mm*45mm*3m/4m steel scaffolding board/plank – RELIANCE, The product will supply to all over the world, such as: Bulgaria , Armenia , Jakarta , With well educated, innovative and energetic staff, we are responsible for all elements of research, design, manufacture, sale and distribution. By studying and developing new techniques, we are not only following but also leading fashion industry. We listen attentively to the feedback from our customers and provide instant replies. You will instantly feel our professional and attentive service.
  • Good quality and fast delivery, it's very nice. Some products have a little bit problem, but the supplier replaced timely, overall, we are satisfied.
    5 Stars By Sally from USA - 2015.06.09 12:42
    The supplier cooperation attitude is very good, encountered various problems, always willing to cooperate with us, to us as the real God.
    5 Stars By Nana from Iraq - 2016.04.18 16:45